The structure of the C-DECK weighing platform is mixed metal-concrete with metal beams (active weighing component) mounted on prefabricated concrete foundation type C45 / 55 according to DIN 1045 which is installed directly on the broken stone infrastructure of the railway, without in situ concrete pouring works.
| MODULE | 2 | 3 |
|---|---|---|
| LENGTH | 15m | 20m |
| PLATFORM | METAL-CONCRETE | |
| CAPACITY (60t / module) [t] | 120 | 120 |
| CLC [k] | 80 | 80 |
| ARROW F [mm] | <1:950 | <1:950 |
| CONSUMPTION | ||
|---|---|---|
| METAL [t] | 10.4 | 15.6 |
| PREFABRICATED CONCRETE [mc] | 8.0 | 13.5 |

The structure of the TRAPPER weighing platform is metallic with beams (active weighing component) mounted on a completely metallic and robust foundation that is installed directly on the broken stone infrastructure of the railway, without concrete in situ pouring works.
| MODULE | 2 | 3 |
|---|---|---|
| LENGTH | 15m | 20m |
| PLATFORM | METAL-CONCRETE | |
| CAPACITY (60t / module) [t] | 120 | 120 |
| CLC [k] | 80 | 80 |
| ARROW F [mm] | <1:950 | <1:950 |
| CONSUMPTION | ||
|---|---|---|
| METAL [t] | 14.6 | 21.9 |
| PREFABRICATED CONCRETE [mc] | - | - |